Check mdac version on windows nt11/20/2022 All equipment necessary for the mixer pump test has been installed by Project W-151. This process test is described in TF-210-OTP-001. This document contains the completed safety analysis which establishes the safety envelope for performing the mixer pump process test in Tank 241-AZ-101. This assessment will describe the methods, protocols, and practices to assure that equipment and systems do not have Y2K problems. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase. The current tank selection and sequence supports phase more » I feed delivery to privatized processing plants. The scope of project W-211 is to provide systems for retrieval of radioactive wastes from ten double-shell tanks (DST). This document will not be updated and any dates contained in this document are estimates and may change. The purpose of this assessment is to give an overview of the project. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-211, Initial Tank Retrieval Systems (ITRS). This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K = , The project is presently on hold, and definitive design and procurement have been completed. A limited description of system dates, functions, interfaces, potential Y2K problems, and date resolutions is presented. The information and experience gained during this process test will provide data for comparison with sludge mobilization prediction models and provide indication of the effects of mixer pump operation on an Aging Waste Facility tank. Two mixer pumps and instrumentation have been or are planned to be installed in waste tank 101-AZ to demonstrate solids mobilization. #72389 - 02:24 AM Re: Installing Mdac 2.This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K compliance for Project W-151, Tank 101-AZ Waste Retrieval System. KiX has two sorts of quotes the single and doubble, so instead of the need for exeptions you just wrap the quotes in opposit qoutes.Īllways use single quotes, unless you have to pass double quotes as part of parameters to a program/object.Īfter removing the exceptions from Appdeploy ,the command to execute is: This is where the force of KiXtart comes in.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |